Process Industrial

Grants Pass UV Disinfection Facility

Infrastructure projects are the backbone of our communities, like Ausland’s home of Grants Pass, Oregon. Ausland installed a UV Disinfection System (16 mgd) at the Grants Pass Water Reclamation Plant. The project included the removal and disposal of existing Trojan 4000 UV disinfection system and associated transformers, electrical and control equipment. Ausland built a new…

Read More
See a List of Other Process Industrial Projects

Grants Pass Hilltop Water Pumping Station Butte Falls Water Treatment Plant Modernization Brookings Water Reclaimation Plant Class B Biosolids De-Watering Facility Medford Water Commission Pump Station and Control Renovation Gospel Rescue Mission Recycling Facility Grants Pass Waste Water Reclaimation Plant Building Renovation

Read More
Bonneville Power Administration
Ellensburg Wind Farm Control House

Selected by Bonneville through a best-value selection process, Ausland construed a control facility for a collector substation to facilitate a new wind farm development. The collector substation provides metering and control of the wind farm as the power is transmitted into the grid. Ausland designed and built the facility in just 12 weeks. The project…

Read More
Bonneville Power Administration
C.J. Slatt Substation and Relay House Facility

Bonneville Power Administration selected Ausland to complete this critical control and relay facility through a best-value approach. Due to the importance of the project, it was fast-tracked to completion in just 12 weeks. This project facilitated the integration of private new wind farms into the power grid.

Read More
Bonneville Power Administration
Rogue Substation Expansion

This project was the first phase of a $14 million expansion of a 115,000-volt substation. Work was fast tracked in just 10 weeks because of the project’s critical nature. Clean-room protocol was necessary due to ongoing operations adjacent to the work area that were key to the integrity of the power grid.

Read More
Medford Waste Water Reclamation
Plant Aeration Basin Expansion

The project purpose was to improve the efficiency of the plant’s water reclamation process. Work included doubling the diffuser capacity of the aeration basin, modifications to primary sedimentation basins, new slide gates, new downward opening weir gates, air header upgrades, a new submersible mixer, and new sluice gates to facilitate bypass capabilities. The project included…

Read More
Grants Pass Water Treatment Plant
Influent Pumping and Screening Upgrades

The objective of the project was to modernize and increase the capacity of influent pumping and screenings processes. The influent pumping system was modernized with a new pumping system capable of pumping 41 million gallons of waste water per day – tripling the plant’s intake capacity. Work also included new slide gates at head works,…

Read More
Medford Water Treatment Plant
Seismic Renovation

Ausland performed a seismic renovation to the Rogue Valley’s water supply facility to protect the integrity of the region’s water supply in the event of an earthquake. The plant has the capacity to produce 45 million gallons per day, and controls the valley’s domestic water supply and delivery network, including a network of pumping stations…

Read More
Illinois Valley High School Biomass Energy Generation Retrofit

Project consisted of retrofitting the school’s old oil burning boiler system into a biomass-fueled system. After completion, the district experienced a 60 percent energy savings.

Read More
Evergreen Elementary Biomass Energy Generation Retrofit

Project consisted of retrofitting the schools old oil burning boiler system into a biomass-fueled system. The project resulted in a 60 percent energy savings to the district.

Read More