Ausland performed a historic renovation to this 76-year-old tribal facility – the oldest tribal facility left in existence.
The project required sensitive matching of historically accurate masonry and siding repairs. Working from original photographs, the team was able to recreate the original masonry, siding, and balustrade assemblies.